|
home
> projects > education > Wilson High School
Wilson High School
 |
| PROJECT
SUMMARY |
|
| Location: |
West Lawn, PA |
| Completed: |
February, 1998 |
|
Square Footage: |
134,000 sf—New
184,000 sf—Existing |
| Total M/E Construction
Cost: |
$8,992,000 |
|
Architects: |
AEM Architects Reading, PA |
|
Special Features:
Multi-zone lighting controls
Campus-wide
communication system |
|
|
|
The Wilson Senior High School
is a
combination of new construction and renovations to parts of
the existing building. The completed structure houses 992
students from grade 10 through grade 12. The new addition
includes the largest gymnasium/sports complex in Berks
County.
|
|
Consolidated
Engineers designed the HVAC, plumbing, fire protection, power, lighting
and data cabling systems for the school. The entire campus, which
includes two other school buildings in addition to the high school, is
linked together via a data communications network. |
|
The sports complex
has a multi-zone lighting control system which provides flexibility for
lighting different types of events. |
1022 James Drive
Leesport PA 19533
Tel
(610) 916-1600 Fax (610) 916-1610 |
|
3000 Atrium Way #103 Mt. Laurel NJ
08054 Tel (856) 273-6969 |
© 2010 Consolidated Engineers. All Rights Reserved.
|